home
***
CD-ROM
|
disk
|
FTP
|
other
***
search
/
Hráč 2004 July
/
Hrac_71_2004-07_dvd.iso
/
dema
/
Americas Army 2_1
/
armyops210.exe
/
BRIEFI~1.cab
/
pipeline_sf.txt
< prev
next >
Wrap
Text File
|
2004-05-20
|
2KB
|
48 lines
ASSAULT
Situation: Terrorist forces have captured Alaskan
Pipeline pump station at grid WA542679, with the intent
of creating an environmental disaster.
Mission: ODA 20-2 will secure Alaskan Pipeline station at
grid WA542679 and negate environmental threat by
accomplishing one of the following: secure main control
panel; stop oil flow at the three valve controls.
ROE: Minimize damage to oil storage containers and pipes.
Enemy: Enemy consists of a squad-sized terrorist force
inside the main pump station.
Troops: One Special Forces A Team.
Terrain: Alaskan Pipeline Pump Station consisting of
three structures; the pump station, the exterior oil
tanks and a one story out-building housing the emergency
shut off valve.
DEFENSE
Situation: Terrorist forces are expected to seize the
Alaskan Pipeline pump station at grid WA542679.
Mission: ODA 20-2 will defend Alaskan Pipeline Pump
Station at grid WA542679 to prevent terrorists from
accomplishing either of the following: taking control of
the main control panel; opening the flow of oil into the
pumps at the three valve controls.
ROE: Minimize damage to oil storage containers and pipes.
Enemy: Enemy consists of a squad-sized force armed with
assault rifles and grenades.
Troops: One Special Forces A Team.
Terrain: Alaskan Pipeline Pump Station consisting of
three structures; the pump station, the exterior oil
tanks and a one story out-building housing the emergency
shut off valve.