home *** CD-ROM | disk | FTP | other *** search
/ Hráč 2004 July / Hrac_71_2004-07_dvd.iso / dema / Americas Army 2_1 / armyops210.exe / BRIEFI~1.cab / pipeline_sf.txt < prev    next >
Text File  |  2004-05-20  |  2KB  |  48 lines

  1. ASSAULT
  2.  
  3. Situation:  Terrorist forces have captured Alaskan 
  4. Pipeline pump station at grid WA542679, with the intent
  5. of creating an environmental disaster.
  6.  
  7. Mission: ODA 20-2 will secure Alaskan Pipeline station at 
  8. grid WA542679 and negate environmental threat by 
  9. accomplishing one of the following: secure main control 
  10. panel; stop oil flow at the three valve controls.
  11.  
  12. ROE: Minimize damage to oil storage containers and pipes.
  13.  
  14. Enemy:  Enemy consists of a squad-sized terrorist force 
  15. inside the main pump station.
  16.  
  17. Troops:  One Special Forces A Team.
  18.  
  19. Terrain:  Alaskan Pipeline Pump Station consisting of 
  20. three structures; the pump station, the exterior oil
  21. tanks and a one story out-building housing the emergency 
  22. shut off valve.   
  23.  
  24.  
  25. DEFENSE
  26.  
  27. Situation:  Terrorist forces are expected to seize the 
  28. Alaskan Pipeline pump station at grid WA542679.  
  29.  
  30. Mission:  ODA 20-2 will defend Alaskan Pipeline Pump 
  31. Station at grid WA542679 to prevent terrorists from 
  32. accomplishing either of the following: taking control of 
  33. the main control panel; opening the flow of oil into the 
  34. pumps at the three valve controls.
  35.  
  36. ROE: Minimize damage to oil storage containers and pipes.
  37.  
  38. Enemy:  Enemy consists of a squad-sized force armed with 
  39. assault rifles and grenades.
  40.  
  41. Troops:  One Special Forces A Team.
  42.  
  43. Terrain:  Alaskan Pipeline Pump Station consisting of 
  44. three structures; the pump station, the exterior oil
  45. tanks and a one story out-building housing the emergency 
  46. shut off valve.   
  47.  
  48.